How Long Does LVP Installation Take?
Short answer: Many rooms take a day or two, but old flooring, levelling and stairs can extend the schedule. Ask for a written timeline.
The installation itself
Laying click-lock planks in an empty, prepared room is fairly quick. Glue-down installation takes longer because the adhesive has to be applied and sometimes left to set before foot traffic.
What adds time
- Removing and disposing of old flooring
- Levelling or repairing the subfloor
- Complex layouts, many doorways and angled cuts
- Stairs, which are cut and fitted step by step
- Waiting for materials or acclimatization
Acclimatization
Some manufacturers ask that planks sit in the room for a period before installation so they match its temperature. Follow the instructions for your product.
Before the crew arrives
Clear the room, plan for pets and children, and confirm access. In a condo, confirm the elevator booking.